Turnaround cost management services

Protect your turnaround budget before work starts.

The contractor rates and approvals set before mobilization decide what gets billed later. Revenew checks them first, so your team can stay focused on the work.

40%
of turnarounds run more than 30% over cost or schedule.*
$1M
in labor overbillings and incorrect equipment charges identified and corrected during a petrochemical plant turnaround.
$171M
across 1,953 contractor invoices reviewed in real time at a petrochemical plant, with $914,000 in future overbillings prevented.

Why it matters

Where turnaround costs drift

A turnaround compresses weeks of contractor labor, equipment, and change orders into a few weeks of billing. Even strong project controls teams rarely have time to check every field ticket and rate once work starts. These are the places we look first.

Rates loaded in the system

If a contractor rate is loaded incorrectly before mobilization, it gets approved on every invoice that follows.

Labor, per diem, and statutory payroll

Craft classifications, per diem rules, and statutory payroll charges are easy to misapply when crews scale up fast.

Equipment, small tools, and consumables

Equipment rates, standby time, and small tools and consumables can drift from the contract as the schedule shifts.

Change orders and third-party services

Scope growth and work contracted through third-party services move quickly, and approval paths can fall behind the work being billed.

Before your next turnaround

Start with a pre-mobilization check

Before contractors mobilize, Revenew reviews the rates for your three largest contractors against what is loaded in your system and flags any mismatches. You go into the turnaround knowing the rates you approve are the rates you agreed to.

What we review
Contracted rates for your three largest contractors, checked against the rates in your system
What you get
A clear summary of any mismatches, ready to correct before the first invoice is approved
What we need
Contractor rate schedules and access to the rates loaded in your system
Timing
Delivered within 30 days
Investment
A set fee, fully credited toward your turnaround engagement

Request a pre-mobilization check

A member of our turnaround team will follow up within one business day.

Revenew is SOC 2 Type 2 certified, so your rate and system data is handled under audited security controls.

Case study

$1M in turnaround overbillings identified in six months

A multinational petrochemical company brought Revenew in to review contractor invoices in real time during a plant turnaround at one of its US sites.

About $1M in labor overbillings and incorrect equipment charges identified and corrected
Root-cause analysis showed contract language had kept a further $1.5M in findings out of reach
Contract language improvements recommended for statutory payroll, small tools and consumables, per diem, and third-party services
Read the full case study
12
supplier contracts and amendments reviewed
468
invoices reviewed
$113M
in contractor billing covered
500,000
estimated labor hours

How it works

Cost assurance before, during, and after the turnaround

The pre-mobilization check is the first step. When your turnaround starts, a pre-payment review checks invoices against your contracts before they are paid, so errors are corrected instead of recovered later.

Before mobilization

Pre-mobilization check

Contracted rates for your largest contractors are checked against your system, so the right rates are in place on day one.

During execution

Pre-payment review

Field tickets and invoices are reviewed against your contracts as work is billed, before payment goes out.

At close-out

Close-out review

The review closes at demobilization, so no unverified charges carry past restart.

Request a pre-mobilization check

Already a Revenew client? 

Ask about a look-back on your most recent turnaround

We review a sample of contractor invoices from your site's last turnaround and show you what got through. Your Revenew account lead can walk you through how it works.

Questions

Frequently asked questions

Who is this for?

Turnaround managers and directors, project controls managers, maintenance directors, and plant managers at refining, chemical, and midstream sites with a turnaround on the calendar.

How does this affect our contractor relationships?

Our reviews are documented at the invoice level and grounded in your contract terms. Clear, shared facts make billing conversations simpler and strengthen working relationships with your contractors.

Does this replace our project controls?

No. Revenew works alongside your project controls team as an extra line of assurance on contractor billing, so your team can stay focused on schedule and execution.

What if our turnaround is already underway?

A pre-payment review can start during execution, and a close-out review can be completed before final payment. Reach out and we will recommend the right starting point.

Go into your next turnaround with the right rates in place.

Request a pre-mobilization check

You have everything to gain.